- During the 10th Five-Year Plan period, China will build a batch of large hydropower stations, including Longtan, Xiaowan, Shuibuya, Goupitan, Sanbanxi and Gongboxia, and a number of large coal-pit mouth power plants.
“十五”期间中国将开工建设龙滩、小湾、水布垭、构皮滩、三板溪、公伯峡等一批大型水电站,同时将建设一批大型坑口电站。 - Sanbanxi face-slab rock-fill dam
三板溪面板堆石坝 - Optimization Design of Model Turbine of Sanbanxi Hydropower Station
三板溪水电站模型水轮机优化设计 - Application of Non- destructive Detecting Technology to Anchor Rod Quality Control for Sanbanxi Hydropower Project
无损检测技术在三板溪工程锚杆质量控制中的应用 - Construction of burrowing piles at slope of the outlet of discharging flood for Sanbanxi Hydropower Station
三板溪水电站泄洪洞出口边坡挖孔桩施工 - Influence of Rebar Design and Construction Sequence on Sanbanxi Rockfill Dam of Concrete Face