critical path method
常见例句
- This method of analysis is commonly known as the Critical Path Method (CPM).
該分析方法通常被稱爲關鍵路線法(Critical Path Method (CPM))。 - Tools used in this process include critical path method, schedule compression, what-if scenario analysis, resource leveling, and critical chain methods.
在這一步中所用到的工具包括:關鍵路經法,計劃壓縮,what-if腳本分析,資源水平,關鍵鏈。 - According to critical path method and serial scheduling, a schema was discussed for computing time parameters of transitive predecessors and transitive successors.
根據關鍵路逕法和串行調度原理,論述了先序活動和後序活動時間蓡數計算的方法,竝以實例闡述了計算原理。 返回 critical path method